ECONPILE HOLDINGS BHD

KLSE: 5253 (ECONBHD)

最近更新时间: 2天之前, 4:01AM

0.380

0.00 (0.00%)

前收盘价格 0.380
收盘价格 0.375
成交量 2,542,700
平均成交量 (3个月) 3,368,573
市值 538,649,984
预期市盈率 (P/E Forward) 31.55
价格/销量 (P/S) 2.03
股市价格/股市净资产 (P/B) 1.62
52周波幅
0.250 (-34%) — 0.495 (30%)
利润日期 27 Aug 2025 - 1 Sep 2025
营业毛利率 -3.02%
营业利益率 (TTM) 2.81%
稀释每股收益 (EPS TTM) -0.010
季度收入增长率 (YOY) -39.10%
总债务/股东权益 (D/E MRQ) 34.02%
流动比率 (MRQ) 2.42
营业现金流 (OCF TTM) 27.44 M
杠杆自由现金流 (LFCF TTM) 38.19 M
资产报酬率 (ROA TTM) 0.10%
股东权益报酬率 (ROE TTM) -2.46%

市场趋势

短期 中期
行业 Engineering & Construction (MY) 看涨 混合的
Engineering & Construction (全球的) 看涨 混合的
股票 ECONBHD 看涨 看跌

AIStockmoo 评分

-0.6
分析师共识 1.5
内部交易活动 NA
价格波动 -1.0
技术平均移动指标 -2.5
技术振荡指标 -0.5
平均 -0.63

相关股票

股票 市值 DY P/E(TTM) P/B
ECONBHD 539 M - - 1.62
MRCB 2 B 1.94% 51.50 0.520
EKOVEST 1 B - - 0.550
AME 990 M 3.87% 9.12 1.05
KIMLUN 575 M 1.35% 7.79 0.700
MITRA 484 M 1.50% 11.08 0.560

Econpile Holdings Bhd along with its subsidiaries is engaged in providing general construction and piling works solutions. Its services include earth retaining systems, earthworks, various piling processes, and basement construction works. The company operates in a single segment which is general construction and piling works. Its other non-reportable segments comprise investment holding and operations related to the rental of investment properties and machinery, trading of machinery, and related accessories. Geographically, the company's operations are carried out in Malaysia which is its key revenue-generating market, and Cambodia.

部门 Industrials
行业 Engineering & Construction
投资方式 Small Value
内部持股比例 42.17%
机构持股比例 25.92%

所有权

姓名 日期 持有股份
The (Cheng Eng) 30 Sep 2022 349,930,000 (24.69%)
Sar (Pang) 30 Sep 2022 277,000,000 (19.54%)
Maybank Asset Management Sdn. Bhd. 31 May 2023 9,090,000 (0.64%)
Toh (Hooi Hak) 30 Sep 2022 7,010,000 (0.49%)
52周波幅
0.250 (-34%) — 0.495 (30%)
0.480 (26.32%)
总计 1 购买
公司 日期 目标价格 调整类型 价格@调整类型
RHB 14 Jul 2025 0.480 (26.32%) 购买 0.395

该时间范围内无数据。

日期 类型 细节
30 Sep 2025 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
24 Sep 2025 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
17 Sep 2025 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
09 Sep 2025 TheEdge Companies in the news: MRCB, Gamuda, Econpile, Affin Bank, Inta Bina, Jati Tinggi, Enra, Pimpinan Ehsan, Unique Fire & Greenyield
09 Sep 2025 TheEdge SkyWorld, Econpile, Vantris Energy (Sapura Energy), Citaglobal, Classita & NexG, DXN, CIMB, Cahya Mata Sarawak, Perak Transit, Bina Puri, Telekom Malaysia & Scicom
09 Sep 2025 TheEdge Econpile: Payments from Maju Expressway’s Abu Sahid were for Maju Kuala Lumpur project, not linked to charges
09 Sep 2025 公告 Econpile Holdings Berhad ("the Company") - Clarification in response to media articles published on 8 September 2025
08 Sep 2025 公告 Award of Sub-contract for Bored Piling Construction and other Associated Works
08 Sep 2025 TheEdge Econpile bags RM54 mil bored piling job for Penang LRT project
29 Aug 2025 公告 Change in Audit Committee - DATUK SYED AZMI BIN SYED OTHMAN
29 Aug 2025 公告 Change in Nomination Committee - DATUK SYED AZMI BIN SYED OTHMAN
29 Aug 2025 公告 Change in Remuneration Committee - DATUK SYED AZMI BIN SYED OTHMAN
29 Aug 2025 公告 Change in Boardroom - DATUK SYED AZMI BIN SYED OTHMAN
29 Aug 2025 公告 Award of Contract for Piling and Substructure Works
29 Aug 2025 公告 Quarterly rpt on consolidated results for the financial period ended 30/06/2025
29 Aug 2025 TheEdge Econpile bags RM23 mil construction job for apartment project in Puchong
29 Aug 2025 公告 MEMORANDUM OF UNDERSTANDING
27 Aug 2025 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
14 Aug 2025 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
13 Aug 2025 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
12 Aug 2025 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
11 Aug 2025 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
06 Aug 2025 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
05 Aug 2025 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
04 Aug 2025 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
30 Jul 2025 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
29 Jul 2025 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
18 Jul 2025 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
18 Jul 2025 TheEdge MRT3 Circle Line tenders likely to restart by mid-2026 — MBSB Research
17 Jul 2025 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
14 Jul 2025 TheEdge Econpile on track to beat FY2026 contract win target, say analysts
显示更多
5年平均股息收益率 0.00%
除息日 公告日期 支付日期 详情
05 Dec 2019 24 Oct 2019 20 Dec 2019 0.005 现金
08 Jun 2018 23 May 2018 26 Jun 2018 0.01 现金
06 Dec 2017 22 Nov 2017 21 Dec 2017 0.015 现金
08 Jun 2017 26 May 2017 22 Jun 2017 0.03 现金
07 Dec 2016 23 Nov 2016 21 Dec 2016 0.015 现金
08 Jun 2016 25 May 2016 28 Jun 2016 0.025 现金
11 Dec 2015 27 Nov 2015 22 Dec 2015 0.01 现金
04 Jun 2015 19 May 2015 23 Jun 2015 0.015 现金
11 Dec 2014 28 Nov 2014 23 Dec 2014 0.01 现金

每年股息收益率

年份 每年总股息 ($) 频率/年份 收益率 %
2019 0.005 1 0.66
2018 0.010 1 2.60
2017 0.045 2 3.72
2016 0.040 2 5.46
2015 0.025 2 5.73
2014 0.010 1 2.96
显示更多

支撑、阻力和趋势线水平是由人工智能(AI)模型生成的,请谨慎解读。

投资组合

AI 建议策略模板

自定义的价格提醒

风险概况

| | | | |
很保守
适度保守
中等
中等风险
激进风险
安全边际 (EP)
部分利润 (TP1)
目标利润 (TP2)
最大损失 (SL)

免责声明:以上内容仅供参考,并非投资建议。请咨询合格的财务顾问。

开始购买价格 (EP)

第一个目标价格赚取利润 (TP1)

第二个目标价格赚取利润 (TP2)

停止损失价格 (SL)

52周波幅范围
 
52WL
 
52WH
SL
EP
TP1
TP2

所有提醒价格都在52周波幅范围内

已实现利润 -
未实现利润 -
收到股息 2025 -
利润总额 -
平均回报 -
数量(购买) -
平均价格(购买) -
数量(卖出) -
平均价格(卖出) -
没有符合您标准的股票