TENAGA NASIONAL BHD

KLSE: 5347 (TENAGA)

最近更新时间: 14小时之前

14.60

0.00 (0.00%)

前收盘价格 14.60
收盘价格 14.60
成交量 5,318,900
平均成交量 (3个月) 5,756,154
市值 85,105,475,584
市盈率 (P/E TTM) 17.80
预期市盈率 (P/E Forward) 18.08
价格/销量 (P/S) 1.24
股市价格/股市净资产 (P/B) 1.69
52周波幅
12.50 (-14%) — 14.90 (2%)
利润日期 27 Aug 2026
股息率 (DY TTM) 3.63%
营业毛利率 7.67%
营业利益率 (TTM) 14.63%
稀释每股收益 (EPS TTM) 0.870
季度收入增长率 (YOY) -0.80%
季度盈利增长率 (YOY) 47.80%
总债务/股东权益 (D/E MRQ) 144.96%
流动比率 (MRQ) 1.17
营业现金流 (OCF TTM) 23.68 B
杠杆自由现金流 (LFCF TTM) 7.62 B
资产报酬率 (ROA TTM) 2.66%
股东权益报酬率 (ROE TTM) 8.34%

市场趋势

短期 中期
行业 Utilities - Regulated Electric (MY) 混合的 混合的
Utilities - Regulated Electric (全球的) 混合的 看涨
股票 TENAGA 混合的 看涨

AIStockmoo 评分

0.9
分析师共识 5.0
内部交易活动 -4.0
价格波动 -0.5
技术平均移动指标 0.0
技术振荡指标 4.0
平均 0.90

Tenaga Nasional Bhd is an electric utility company in Malaysia. The company is involved in the generation, transmission, distribution, and retail of electricity. TNB segments includes Power Generation, Grid, Distribution Network, and Retail. The company encompasses the company's portfolio of thermal and hydroelectric power plants located throughout Malaysia. Through its subsidiaries, TNB also engages in other energy-related operations, such as the manufacturing of transformers. The company generates maximum revenue through the sale of electricity in Malaysia. Its customers are mainly commercial operations, residential consumers, and large industrial entities.

部门 Utilities
行业 Utilities - Regulated Electric
投资方式 Large Value
内部持股比例 0.40%
机构持股比例 76.99%
52周波幅
12.50 (-14%) — 14.90 (2%)
目标价格波幅
16.00 (9%) — 18.15 (24%)
18.15 (HLG, 24.32%) 购买
16.50 (13.01%)
16.00 (PUBLIC BANK, 9.59%) 购买
平均值 17.03 (16.64%)
总计 5 购买
平均价格@调整类型 14.28
公司 日期 目标价格 调整类型 价格@调整类型
RHB-OSK 23 Jul 2026 16.50 (13.01%) 购买 14.50
21 Jul 2026 16.50 (13.01%) 购买 14.56
TA 17 Jul 2026 18.00 (23.29%) 购买 14.30
15 Jul 2026 18.00 (23.29%) 购买 14.38
RHB 10 Jul 2026 16.50 (13.01%) 购买 14.30
29 Jun 2026 16.50 (13.01%) 购买 14.26
HLG 26 May 2026 18.15 (24.32%) 购买 14.16
PUBLIC BANK 26 May 2026 16.00 (9.59%) 购买 14.16
名称 平均购买 ($) 平均卖出 ($) 总净额 总净值 ($)
EMPLOYEES PROVIDENT FUND BOARD 14.30 14.30 -6,460,400 -92,383,720
KUMPULAN WANG PERSARAAN (DIPERBADANKAN) - 14.29 -704,000 -10,066,420
累积净数量 -7,164,400
累积净值 ($) -102,450,140
累积平均购买 ($) 14.30
累积平均卖出 ($) 14.30
名称 持有人 日期 类型 数量 价格 价值 ($)
KUMPULAN WANG PERSARAAN (DIPERBADANKAN) 大股东 22 Jul 2026 处理 (-) 39,000 14.28 556,920
EMPLOYEES PROVIDENT FUND BOARD 大股东 20 Jul 2026 处理 (-) 938,800 14.30 13,424,840
EMPLOYEES PROVIDENT FUND BOARD 大股东 20 Jul 2026 处理 (-) 758,000 14.30 10,839,400
EMPLOYEES PROVIDENT FUND BOARD 大股东 20 Jul 2026 获得 (+) 200,000 14.30 2,860,000
KUMPULAN WANG PERSARAAN (DIPERBADANKAN) 大股东 17 Jul 2026 处理 (-) 665,000 14.30 9,509,500
EMPLOYEES PROVIDENT FUND BOARD 大股东 17 Jul 2026 处理 (-) 2,497,700 14.30 35,717,110
EMPLOYEES PROVIDENT FUND BOARD 大股东 17 Jul 2026 处理 (-) 1,965,900 14.30 28,112,370
EMPLOYEES PROVIDENT FUND BOARD 大股东 17 Jul 2026 处理 (-) 500,000 14.30 7,150,000
日期 类型 细节
30 Jul 2026 TheEdge Utilities will define next phase of digital growth — MBSB
29 Jul 2026 TheEdge Special Report: My Value Up needs a scoreboard, not just good storytelling
29 Jul 2026 TheEdge ADS enters P2P financing space with focus on mid-tier companies
28 Jul 2026 TheEdge Miti: No price control mechanism for EV charging to encourage private-sector participation
27 Jul 2026 TheEdge TNB, Air Selangor sign agreements to strengthen critical infrastructure
27 Jul 2026 TheEdge GSPARX powers EVE Energy Malaysia with largest rooftop solar project
27 Jul 2026 TheEdge Structural growth reshapes investment case for utility stocks
24 Jul 2026 TheEdge Khazanah sold RM1.39 bil Tenaga stake in placement — Bloomberg
23 Jul 2026 TheEdge Pavilion REIT 2Q property income up 11%, declares 5.17 sen DPU
20 Jul 2026 TheEdge Executing ASEAN’s Energy Transition: What Will It Take?
20 Jul 2026 TheEdge MN Holdings gets regulatory approval for transfer to Main Market
20 Jul 2026 TheEdge Second gas power plant RFP in two years said to have drawn five bids
20 Jul 2026 TheEdge Malaysia needs to hustle to maintain power grid buffer as data centres flourish
10 Jul 2026 TheEdge Petra to review objections over Kuala Muda solar project
09 Jul 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
08 Jul 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
08 Jul 2026 TheEdge Second wave of data centre boom is here, says Kenanga, as infrastructure projects slow
07 Jul 2026 TheEdge Astro, Zetrix AI, Master Tec, Niche Capital Emas, MCE, Reservoir Link Energy, Rhong Khen, Waja Konsortium, Theta Edge, Nova MSC
07 Jul 2026 TheEdge TNB supplied power to 36 data centres through 1Q2026, says Petra
07 Jul 2026 TheEdge Master Tec secures one-year extension for TNB cable supply contract worth RM109.5m
06 Jul 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
03 Jul 2026 TheEdge Jati Tinggi JV bags RM27.5 mil hydroelectric dam enhancement job
03 Jul 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
03 Jul 2026 TheEdge Unisem, Duopharma, Southern Cable, Reservoir Link Energy, Jentayu Sustainables & Bumi Armada
03 Jul 2026 TheEdge Insas, Inari Amertron, UEM Sunrise, Nova MSC, Theta Edge, Rohas Tecnic, WTK, Hextar Industries, Mesiniaga, Jati Tinggi, TNB, Radium
02 Jul 2026 TheEdge Southern Cable bags RM404m contract extension from TNB
01 Jul 2026 TheEdge Epicon sues subcontractor to recover alleged unpaid amount of RM20.3 mil
01 Jul 2026 TheEdge Binastra, TXCD, Berjaya Food, Seal, Sapura Industrial, Epicon, PRG
01 Jul 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
30 Jun 2026 TheEdge Maybank IB upgrades tech sector, eyes short-term plantation gains for 2H as 'war premium' stocks lose steam
30 Jun 2026 TheEdge Brokers Digest: Local Equities - Gamuda Bhd, Southern Cable Group Bhd, Uzma Bhd, Sarawak Plantation Bhd
30 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
29 Jun 2026 TheEdge The beneficiaries of Malaysia’s power supercycle
29 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
29 Jun 2026 公告 Change in Risk Committee - ENCIK MUAZZAM BIN MOHAMAD
29 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
26 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
26 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
25 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
24 Jun 2026 TheEdge Kee Ming bags RM70 mil subcontract works for Kedah solar plant
24 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
24 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
23 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
23 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
23 Jun 2026 TheEdge Kenanga sees 40% upside for YTL Power as Johor data centre capacity could double by end-2027
22 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
21 Jun 2026 TheEdge Malaysia well-positioned to lead in energy transition financing — TNB officer
19 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
19 Jun 2026 TheEdge Aizo unit secures RM346 mil Islamic financing facilities to support Kampar solar project
18 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
18 Jun 2026 TheEdge Johor's data centres could consume 40% electricity demand by 2035, says WoodMac
18 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
16 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
16 Jun 2026 TheEdge Beshom Holdings to sell 14.6 acres of land in Klang for RM86 mil
16 Jun 2026 公告 DEALINGS IN LISTED SECURITIES (CHAPTER 14 OF LISTING REQUIREMENTS) : Dealings Outside Closed Period
16 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
15 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
12 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
12 Jun 2026 公告 Change in Nomination and Remuneration Committee - DATO' SRI AB RAHIM BIN AB RAHMAN
12 Jun 2026 TheEdge Rakuten recommends 10 stocks for 2H2026, including five small- and mid-cap names
12 Jun 2026 公告 Change in Boardroom - DATO' SRI AB RAHIM BIN AB RAHMAN
11 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
10 Jun 2026 TheEdge Maybank, Gamuda, Scientex, Ann Joo, Rohas Tecnic, ISF Group, Amway, OGX Group
10 Jun 2026 TheEdge Rohas bags second TNB contract in two days, worth RM42.4 mil
10 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
09 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
09 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
08 Jun 2026 TheEdge Astro, AMMB Holdings, Keyfield International, Securemetric, Cypark Resources, Muhibbah Engineering, Rohas Tecnic, Hextar Capital
08 Jun 2026 TheEdge Rohas unit wins TNB fibre optic contract for Johor high-voltage network
08 Jun 2026 TheEdge Muhibbah gets RM300m contract to build part of regasification terminal
08 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
08 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
05 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
05 Jun 2026 TheEdge Financials, utilities to lose weight on KLCI as IOI Properties enters, Sime Darby exits
05 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
04 Jun 2026 TheEdge TNB delivers 4.3 GW installed renewable energy capacity to support energy transition
04 Jun 2026 TheEdge TNB, Petronas Gas to co-develop third regasification terminal in Perak
04 Jun 2026 TheEdge PM has full confidence in TNB driving nation’s energy transition efforts
04 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
04 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
04 Jun 2026 公告 WINDING UP / RECEIVER & MANAGER / RESTRAINING ORDER / SPECIAL ADMINISTRATOR
04 Jun 2026 公告 HEADS OF AGREEMENT ("HOA") IN RELATION TO SHAREHOLDERS' AGREEMENT ENTERED INTO BETWEEN INTEGRAX BERHAD AND PETRONAS GAS BERHAD FOR JOINT DEVELOPMENT OF THE THIRD REGASIFICATION TERMINAL IN LUMUT, PERAK ("RGT-3")
04 Jun 2026 TheEdge IOI Properties, Sime Darby, PETRONAS Gas, TNB, MISC, Velesto Energy, GIIB, Sentoria, PRG, Maxim Global, Sapura Industrial
03 Jun 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
03 Jun 2026 TheEdge Malaysia faces financing and technology hurdles in scaling up CCUS, says Economy Ministry official
03 Jun 2026 TheEdge ES Sunlogy unit wins RM12.7 mil TNB contract
02 Jun 2026 TheEdge Insider Moves: Unisem (M) Bhd, VS Industry Bhd, Kelington Group Bhd, Mikro MSC Bhd, Top Glove Corp Bhd, Tenaga Nasional Bhd
01 Jun 2026 TheEdge GLICs poised for stronger dividend haul despite global uncertainty
29 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
29 May 2026 公告 TENAGA NASIONAL BERHAD'S ISSUANCE OF ISLAMIC MEDIUM TERM NOTES OF RM4.0 BILLION ("RM4.0 BILLION SUSTAINABILITY SUKUK WAKALAH") UNDER AN ISLAMIC MEDIUM TERM NOTES PROGRAMME OF UP TO RM10.0 BILLION IN NOMINAL VALUE BASED ON THE SHARIAH PRINCIPLE OF WAKALAH BI AL-ISTITHMAR ("SUKUK WAKALAH PROGRAMME")
29 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
29 May 2026 TheEdge Nomura sees Malaysia as supply chain shift winner, highlights key property, construction, energy and AI stocks
29 May 2026 TheEdge Tenaga Nasional raises RM4b from inaugural sustainability sukuk issuance
28 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
28 May 2026 TheEdge TNB’s RM43 bil grid modernisation gears up for rapid growth in data centre demand
28 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
27 May 2026 TheEdge MN Holdings seeks larger infrastructure and solar EPCC jobs for next growth phase
26 May 2026 TheEdge Southern Cable’s 1Q net profit up 21% on higher cable, wires sales
26 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
25 May 2026 TheEdge The Week Ahead: April PPI, Muhyiddin’s power abuse, money laundering trial, 1Q corporate earnings in focus
25 May 2026 TheEdge Axiata, MISC, Gamuda, Sime Darby, IJM, BAT, Censof, Karex, Oppstar, MBM Resources, ITMAX, Allianz, Lianson Fleet, Cahya Mata Sarawak, Inari Amertron, Tenaga Nasional, Bank Islam, Kelington
25 May 2026 公告 EXTENSION OF POWER PURCHASE AGREEMENT ("PPA") FOR KENYIR HYDRO POWER STATION PRIOR TO HYDRO LIFE EXTENSION PROGRAM ("HLEP")
25 May 2026 公告 WINDING UP / RECEIVER & MANAGER / RESTRAINING ORDER / SPECIAL ADMINISTRATOR
25 May 2026 公告 Quarterly rpt on consolidated results for the financial period ended 31/03/2026
25 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
25 May 2026 TheEdge Tenaga's 1Q net profit up 3.7% on higher power demand, lower fuel costs
22 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
21 May 2026 公告 Change in Boardroom - PUAN JUNIWATI RAHMAT HUSSIN
21 May 2026 公告 Change in Boardroom - DATUK RAMZI BIN MANSOR
21 May 2026 公告 Change in Nomination and Remuneration Committee - PUAN JUNIWATI RAHMAT HUSSIN
21 May 2026 公告 Change in Nomination and Remuneration Committee - DATUK RAMZI BIN MANSOR
21 May 2026 公告 Change in Audit Committee - MISS ONG AI LIN
21 May 2026 公告 Change in Nomination and Remuneration Committee - ENCIK MUAZZAM BIN MOHAMAD
21 May 2026 公告 Change in Boardroom - MISS ONG AI LIN
21 May 2026 公告 Change in Risk Committee - MISS ONG AI LIN
21 May 2026 公告 General Meetings: Outcome of Meeting
21 May 2026 公告 Change in Boardroom - DR HASNITA BINTI DATO' HASHIM
21 May 2026 公告 Change in Nomination and Remuneration Committee - DR HASNITA BINTI DATO' HASHIM
21 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
20 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
19 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
18 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
18 May 2026 TheEdge Fadillah calls for stronger R&D in energy storage technology with launch of Santong BESS
18 May 2026 TheEdge Malakoff subsidiaries secure PPA extensions for 1,732MW Lumut power plants
15 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
15 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
14 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
14 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
14 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
13 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
12 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
12 May 2026 TheEdge Carimin Petroleum, Sealink International, Inari Amertron, UOA Development, UOA REIT, MISC, iCents, DKSH Malaysia, Teo Seng Capital, Orkim, Pekat, Dutch Lady, Meta Bright, Tenaga
12 May 2026 TheEdge Meta Bright inks 20-year deal to install solar PV system at Pahang surau
12 May 2026 TheEdge TNB, Malaysian Hockey Confederation sign RM25 mil five-year sponsorship deal
11 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
09 May 2026 TheEdge Petronas Dagangan, Cape EMS, Tenaga Nasional, Mr DIY, Hume Cement, Skyechip, Gold Li Holdings, KJTS, KIP REIT, PUC and Zelan
08 May 2026 TheEdge Tenaga unit issues sukuk to raise RM1.05 bil mainly to finance Kedah solar project
08 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
08 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
08 May 2026 公告 TNB KUALA MUDA SOLAR SDN. BHD.'S ISSUANCE OF ISLAMIC MEDIUM TERM NOTES OF RINGGIT MALAYSIA ONE BILLION AND FIFTY MILLION (RM1,050,000,000.00) IN NOMINAL VALUE BASED ON THE SHARIAH PRINCIPLE OF WAKALAH BI AL-ISTITHMAR ("ASEAN GREEN SRI SUKUK WAKALAH")
07 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
07 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
07 May 2026 TheEdge Reneuco to be delisted on May 12 after Bursa dismisses appeal
06 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
05 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
05 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
05 May 2026 TheEdge High Court orders Tenaga to pay RM4.74 mil to 100 victims over 2013 Cameron Highlands flood
04 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
04 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
04 May 2026 公告 Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
04 May 2026 TheEdge PETRONAS Gas’ RGT-3 in Lumut will be Malaysia’s first floating storage and regasification unit
显示更多
股息率 (DY TTM) 3.63%
5年平均股息收益率 4.83%
股息支付比率 58.85%
预计下次股息支付 Oct 2026
除息日 公告日期 支付日期 详情
30 Mar 2026 09 Mar 2026 17 Apr 2026 0.28 现金
29 Sep 2025 10 Sep 2025 16 Oct 2025 0.25 现金
27 Mar 2025 12 Mar 2025 16 Apr 2025 0.26 现金
27 Sep 2024 11 Sep 2024 17 Oct 2024 0.25 现金
27 Mar 2024 11 Mar 2024 18 Apr 2024 0.28 现金
27 Sep 2023 12 Sep 2023 17 Oct 2023 0.18 现金
30 Mar 2023 15 Mar 2023 14 Apr 2023 0.26 现金
29 Sep 2022 13 Sep 2022 14 Oct 2022 0.2 现金
30 Mar 2022 15 Mar 2022 15 Apr 2022 0.18 现金
29 Sep 2021 09 Sep 2021 15 Oct 2021 0.22 现金
30 Mar 2021 15 Mar 2021 16 Apr 2021 0.18 现金
30 Mar 2021 15 Mar 2021 16 Apr 2021 0.4 现金
29 Sep 2020 10 Sep 2020 14 Oct 2020 0.22 现金
30 Mar 2020 12 Mar 2020 16 Apr 2020 0.2 现金
30 Mar 2020 12 Mar 2020 16 Apr 2020 0.5 现金
27 Sep 2019 10 Sep 2019 11 Oct 2019 0.3 现金
27 Mar 2019 13 Mar 2019 11 Apr 2019 0.23 现金
26 Sep 2018 06 Sep 2018 11 Oct 2018 0.3027 现金
04 Apr 2018 19 Mar 2018 19 Apr 2018 0.2141 现金
19 Dec 2017 20 Nov 2017 29 Dec 2017 0.44 现金
18 May 2017 03 May 2017 31 May 2017 0.17 现金
16 Dec 2016 17 Nov 2016 30 Dec 2016 0.22 现金
18 May 2016 03 May 2016 31 May 2016 0.1 现金
15 Dec 2015 19 Nov 2015 31 Dec 2015 0.19 现金
18 May 2015 30 Apr 2015 29 May 2015 0.1 现金
17 Dec 2014 20 Nov 2014 31 Dec 2014 0.19 现金
15 May 2014 29 Apr 2014 29 May 2014 0.1 现金
18 Dec 2013 20 Nov 2013 31 Dec 2013 0.15 现金
15 May 2013 25 Apr 2013 29 May 2013 0.1 现金
17 Dec 2012 22 Nov 2012 28 Dec 2012 0.15 现金
14 May 2012 26 Apr 2012 25 May 2012 0.0509 现金
12 May 2011 27 Apr 2011 27 May 2011 0.045 现金
14 Dec 2010 18 Nov 2010 30 Dec 2010 0.2 现金
13 May 2010 28 Apr 2010 27 May 2010 0.06 现金
14 Dec 2009 17 Nov 2009 24 Dec 2009 0.123 现金
11 May 2009 28 Apr 2009 22 May 2009 0.04 现金
10 Dec 2008 26 Nov 2008 23 Dec 2008 0.1 现金
15 May 2008 02 May 2008 29 May 2008 0.1 现金
13 Dec 2007 30 Nov 2007 03 Jan 2008 0.163 现金
17 Aug 2007 06 Aug 2007 30 Aug 2007 0.1 现金
28 May 2007 15 May 2007 07 Jun 2007 0.1 现金
13 Dec 2006 01 Dec 2006 04 Jan 2007 0.14 现金
14 Dec 2005 05 Dec 2005 10 Jan 2006 0.12 现金
24 Jun 2005 08 Jun 2005 12 Jul 2005 0.03 现金
24 Dec 2004 29 Oct 2004 24 Jan 2005 0.14 现金
11 Jun 2004 21 May 2004 07 Jul 2004 0.03 现金
26 Dec 2003 11 Nov 2003 26 Jan 2004 0.078 现金
06 Jun 2003 13 May 2003 01 Jul 2003 0.03 现金
27 Dec 2002 04 Dec 2002 27 Jan 2003 0.06 现金
07 Jun 2002 14 May 2002 03 Jul 2002 0.03 现金
21 Dec 2001 29 Oct 2001 16 Jan 2002 0.043 现金
显示更多

每年股息收益率

年份 每年总股息 ($) 频率/年份 收益率 %
2026 0.280 1 1.92
2025 0.510 2 3.72
2024 0.530 2 3.55
2023 0.440 2 4.38
2022 0.380 2 3.95
2021 0.800 3 8.57
2020 0.920 3 8.83
2019 0.530 2 4.00
2018 0.517 2 3.80
2017 0.610 2 4.00
2016 0.320 2 2.30
2015 0.290 2 2.18
2014 0.290 2 2.10
2013 0.250 2 2.20
2012 0.201 2 2.90
2011 0.045 1 0.76
2010 0.260 2 3.88
2009 0.163 2 2.43
2008 0.363 3 7.26
2007 0.340 3 4.43
2006 0.120 1 1.38
显示更多

支撑、阻力和趋势线水平是由人工智能(AI)模型生成的,请谨慎解读。

投资组合

AI 建议策略模板

自定义的价格提醒

风险概况

| | | | |
很保守
适度保守
中等
中等风险
激进风险
安全边际 (EP)
部分利润 (TP1)
目标利润 (TP2)
最大损失 (SL)

免责声明:以上内容仅供参考,并非投资建议。请咨询合格的财务顾问。

开始购买价格 (EP)

第一个目标价格赚取利润 (TP1)

第二个目标价格赚取利润 (TP2)

停止损失价格 (SL)

52周波幅范围
 
52WL
 
52WH
SL
EP
TP1
TP2

所有提醒价格都在52周波幅范围内

已实现利润 -
未实现利润 -
收到股息 2026 -
利润总额 -
平均回报 -
数量(购买) -
平均价格(购买) -
数量(卖出) -
平均价格(卖出) -
没有符合您标准的股票